- 4/18-22/11 Proprietary WiFi CCX Calibration at Cincinnati Children’s, 5-days Jr Eng.
- 4/24-29/11 Proprietary WiFi CCX calibration at IUH Indianapolis, 5-days, 4-men
- 4/26/11 Upgraded pilot RTLS/RFID testing servers at the VA Indy, 1-man ½-day
- 5/2-5/11 Troubleshoot WiFi/RTLS issues at Ontario Shores Hosp in Canada, 1 man, 4-days
- 5/16-20/11 UK Med Center/Good Sam adding additional calibration to RTLS model, 2 men, 3-days
- 5/24-26/11 Calibrating and activating RTLS model for St Johns, Anderson, IN, 2 men, 3-days
- 5/31-6/1 Troubleshoot RTLS zone issues at Home of the Innocents Louisville KY, 1 man, 2 days
- 6/16-17/11 OSUMC (Ohio State) troubleshooting issues and training 1 man, 2-days
- 6/21-22/11 verifying remedies at OSC Ontario were completed, re-calibrating, 1 man, 2-days
- 7/11-15/11 OSUMC roll-out, test, train staff on use of RTLS badge-tags for safety measures 1 man, 4.5-days
- 7/18-23/11 Quarryville, PA recalibration, testing of wristband tag for safety in retirement facilities. 1 man, 5-days.
- 8/2-5/11 IUH, Indy troubleshooting, calibrating new space. 2 men 3.5-days.
- 8/8-12/11 OSC Ontario, adding testing all zones regarding RTLS staff safety , 1 man, 5-days
- 8/15-19/11 Scottsdale Health, AZ recalibration of Proprietary Aruba blink network. 4 men, 5-days.
- 8/31-9/2/11 OSC Ontario, testing of zones and failover of RTLS safety system. 1 man, 2.5 days.
- 11/14-15/11 Ascension -St. Johns additional RTLS calibration at St Johns, Anderson, IN 1 man, 2-days.
- 12/12-14/11 IUH Indianapolis RTLS/RFID tag swap. 2 men, 3-days.
- 1/17-20/12 IUH additional CCX mode RTLS calibration at Riley Children’s Hosp, 2 men, 4-days.
- 1/24-27/12 IUH additional CCX mode calibration of Riley Children’s Hosp, 2 men, 3.5-days.
- 1/30-2/2/11 IUH Methodist Hosp CCX mode calibration, 2 men, 4-days.
- 2/15-17/12 IUH Indy re-calibration mop-up of Methodist and Riley Hosp, 2 men, 3-days.
- 3/12-16/12 UVA Charlottesville, VA . Cisco CCX mode calibration 2 men, 5-days.
- 3/19-22/12 UVA Charlottesville, VA . CCX mode calibration, 2 men, 3.5-days.
- 3/26-28/12 RTLS System Installation Training for Solstice in Novi, MI. 1 man, 2-days.
- 4/2-6/12 Installation, CCX mode calibration For the VA, VISN 10 Chillicothe, OH 1 man, 2-days
- 4/9-11/12 calibration in CCX mode at the VA, Chillicothe, OH. 1 man, 4-days.
- 4/16-20/12 NW Children’s Columbus, OH Meru blink calibration of new facility, 3 men, 4-days.
- 4/17-18/12 Community Health in IN, training and troubleshooting, 1 man, 2-days.
- 4/22-29/12 Parkland Mem, Houston, TX. Troubleshooting WiFi/RTLS issues and re-calibrating an Aruba blink implementation, 2 men, 5-days.
- 4/29-5/4/12 Parkland Mem, Houston, TX. Troubleshooting WiFi/RTLS issues and re-calibrating an Aruba blink implementation, 2 men, 5-days.
- 5/8/12 VA at Chillicothe, troubleshooting why WLCs not reporting CCX client info, 1 man, 1-day. (I found that a Cisco IOS update on the routers had disabled local RTLS funtions-non published Cisco TSB)
- 5/15-17/12 VA at Chillicothe, OH. Verifying WLC issues were fixed, re-calibrate and test RTLS system, activate and update RFID tag firmware. 2 men, 3-days.
- 5/13-18/12 Ben Taub, Houston, TX updating firmware and activating RFID tags, 1 man, 5-days.
- 5/13-18/12 LBJ/Ben Taub Hosp. updating firmware and activating RFID tags. 1 man, 4.5-days.
- 5/21-22/12 OSUMC troubleshoot tag update issues, capture and analyze packets, 1 man, 2-days.
- 5/21-25/12 Harris Co, LBJ Houston, TX tag remediation issues, 1 man, 4.5-days.
- 5/22-24/12 Update 2500 active RFID tags for the VA at Chillicothe, OH 2 men, 2-days.
- 5/29-31/12 VA at Chillicothe, OH calibrate new areas in CCX mode and test, 2 men, 3-days.
- 6/4-7/12 OSUMC-Doan Hosp. calibrate new areas after construction. 2 men, 4-days.
- 6/4-8/12 UVA Charlottesville, VA RTLS IR beacon installation, 1 man, 5-days.
- 6/12-13/12 UVA Charlottesville, VA RTLS IR beacon installation, 1 man, 2-days.
- 6/11-15/12 St Vincent’s –Fishers, IN CCX mode calibration, 4 men, 5-days.
- 6/18-22/12 St Vincent’s –Fishers, IN CCX mode calibration, 4 men, 4.5-days.
- 6/25-28/12 LBJ Hosp Houston, TX RTLS tag firmware updates, 1 man, 3.5-days.
- 6/25-7-13/12 St Vincent’s-Fishers, IN add 2.2M sq. of CCX mode calibration at 86 the ST campus for Ascension. 4 men, over 4 weeks, minus weekends.
- 6/25-28/12 LBJ Houston, TX finish tag firmware updates/testing 1 man, 3.5-days.
- 7/9-12/12 VA in Chillicothe, OH CCX mode calibration ram mop-up and model test. 1man, 4-days.
- 7/16-20/12 St Vincent’s, Fishers IN calibration in CCX mode 4 men, 4.5-days.
- 7/29-8/2/12 SCCA Seattle, WA temp-tag installation 1 man, 4-days.
- 8/6-9/12 NW Children’s Columbus adding newly calibrated area to the model, 2 men, 4-days.
- 2/25-3/1/13 VA in Chillicothe, OH resolving temperature monitoring issues, 1 man, 5-days.
- 3/19-22/13 Calibration and training at St. Vincent’s Ascension, Seton, IN, 1 man, 4-days.
- 5/15/13 Active tagging meeting at the VA Medical Center Dayton, OH. 1 man, ½ day.
- 8/5/13 Troubleshooting tag activation issues at 2 VA sites, 1 man ½ day each site.
- 7/8-12/13 Tagging assets at the Dayton VA Medical Center, 2 men, 5-days.
- 7/15-19/13 Tagging assets at the Cincinnati VA Hospital, 1 man, 5-days.
- 2/9-21/14 Installing RF Beacons at Sarasota Memorial Hospital, 2 men, 10-days.
- 3/2-7/14 Calibration at Sarasota Memorial Hospital, 2 men, 5-days.